Bakhvi 3 HPP

About Project
Production
Financials
Bonds
Images
360 View
About Project

We own and operate a state-of-the art, brand new run-of-river hydro power plant on the Bakhvis Tskali River in Ozurgeti Municipality, in the Guria region of western Georgia. With 9.8 MW installed capacity and annual power production of 41 GWh it provides year around energy, and we employ a 40+ person team of highly experienced hydro-energy specialists to run it.

Bakhvi 3 HPP was fully commissioned in 2015, and thanks to favorable weather conditions and sound operational techniques it generated 46.7GWh of electricity in 2016 (at 56% of load).

Bakhvi Hydro Power LLC (the Company) was established according to the Law of Georgia on Entrepreneurs on January 15, 2009 and is registered in Tbilisi. The Company was initially established following the Partnership Agreement between Rotterman Georgia LLC and Georgian Hydro Power LLC, for the objective of installing, launching and utilize jointly the Hydro Power Plant Bakhvi 3 on the River Bakhvis Tskali in Guria region, Georgia in accordance with the Memorandum of Understanding with the government of Georgia dated 14 May 2009 for the development, ownership and operation of the power plant.

In 2011 Silk Road Energy (formerly known as KG Energy) has fully taken over the Company, the project and has undertaken construction and commissioning of the Bakhvi HPP under the newly agreed term of the Memorandum of Understanding with the government of Georgia.

In late 2014 SRG has integrated its management systems and environment into renewable energy development and operation business through full acquisition of KG Energy, completion and commissioning of the Bakhvi HPP and renaming the company into Silk Road Energy.

Since 2019 Silk Road Energy’s team has been consolidated with Silk Energy Holding which has also replaced Silk Road Energy LLC in its shareholding of the Bakhvi company.

“Bakhvi Hydro Power LLC is jointly owned by Silk Energy Holding LLC (63.27%), CCEH Hydro I LLC (17.1%) and CCEH Hydro II LLC (19.63%)”.

Click here for information on our Bond Issuance

Location: Ozurgeti, Guria
River: Bakhvis Tskali River
Net head: 195 meters
Water discharge: 6 m3/sec.
Number and type of units: 3, Francis
Installed capacity: 9.8MW
Capacity load factor: 47%
Average annual generation: 41GWh
Regulation type: Unregulated
Seismic risk level: Low
Production
Financials
Bakhvi Hydro Power LLC - IFRS 2016_GEO

Bakhvi Hydro Power LLC - IFRS 2016_GEO

Bakhvi Hydro Power LLC - IFRS 2016_ENG

Bakhvi Hydro Power LLC - IFRS 2016_ENG

Bonds

Bakhvi Hydro Power LLC (BHP) is a subsidiary of Silk Road Energy and thus also Silk Road group, and it is now offering any interested party to invest into 1.267 million USD of 10-year unsecured bonds

Bonds will be issued in dematerialized registered form.  The ownership  title  over  the  Bonds  will  be  shown in the register maintained by the registrar (as defined in the “BHP Bond Prospect”), and transfers of the Bonds shall be effected only through corresponding entries in the respective registries

Offering conditions:

Issuer Bakhvi Hydro Power LLC (ID 205270810)
Bond Issuance 3 November 2017
Offering Closing Date 3 December 2017
Total Offering Price 1,265,000 US Dollars
Minimum placement lot 1 bond (1,000 US dollars)
Annual Interest (coupon) rate 9.4%*
Bond Currency US Dollars
Maturity Date 10 years from the Bond Issuance
Status of the Bonds Unsecured
Placement Agent Silk Road Bank (ID 201955027)
Bookrunner SP Advisors 

* including applicable taxes

  • BHP Bond Prospect (unofficial version)
  • Decree of the National Bank of Georgia
  • BHP audited financial statement 2016
Images
360 View

© Silk Energy Holding